Frame connections
Verify the pin or clip used at frame-extension and related interfaces.
Scaffold locking components
Source long pin clips, short pin clips and leg locks by exact part reference and scaffold-system compatibility rather than appearance alone.
Application overview
Pin clips and leg locks retain or secure scaffold components at specific interfaces. Because these pieces are small, they are easy to misidentify. Match the exact part code, connection geometry and scaffold system rather than substituting a visually similar clip or lock.

Where it fits
Real-world starting points for discussing the work, footprint and environment.
Verify the pin or clip used at frame-extension and related interfaces.
Match locks to the exact adjustable-leg or base arrangement.
Keep compatible clips and locks with the corresponding scaffold system.
Store traceable replacement components so damaged or missing hardware is not improvised in the field.
Selection guidance
For reliable identification, send the existing code if available, close-up photographs, dimensions and the component interface. Avoid field-made pins or unverified substitutes.
Discuss Your Requirements01—05
Information to include
A better specification process
Documenting the work before choosing components reduces assumptions and helps compare practical options.
Collect part markings, labels and system records.
Record critical dimensions and interface geometry.
Use only the compatible component and follow manufacturer assembly instructions.
Verified component references
Use these codes as identification references only. Final compatibility, quantity and complete-system suitability are confirmed during quoting.
Continue your research
Move between product, application and technical pages without losing the context of the current decision.
Page-specific answers
Clear answers help teams evaluate fit, collect the right project details and begin a productive conversation.
Ask a QuestionThe supplier catalog identifies a long pin clip, short pin clip and leg lock as separate components.
Do not substitute unverified hardware. Retention components must match the system and manufacturer requirements.
Identify the scaffold system and connection point, then source the correct replacement before returning the system to service.
Follow manufacturer inspection and replacement guidance; do not improvise repairs on questionable components.
Need the right configuration?
Share the application, footprint, environment and access requirements. We’ll help identify a practical next step.
Specialized companies. One access network.